Product History

The Four Stages of Product Development

Phase 1: Technical Feasibility Verification (2018.06 - 2020.03)

This phase focused on verifying the core technical feasibility of the project.

  • Completed the development of the V1.0 prototype.
  • Verified the feasibility of using a six-axis robotic arm for twist-lock handling.
  • Laid the foundation for subsequent engineering development.

Phase 2: Engineering Prototype Development (2020.04 - 2021.06)

This phase aimed to develop a stable and reliable engineering prototype.

  • Developed the V2.0 engineering prototype.
  • Overcame key technical challenges in core components such as the self-adaptive gripper and AI vision algorithms.
  • The system's stability and reliability were significantly improved.

Phase 3: Productization and Market Promotion (2021.07 - 2022.12)

This phase focused on transforming the prototype into a commercial product and promoting it in the market.

  • Launched the V2.1 product.
  • Achieved the first commercial order and stable operation at Nanjing Port.
  • Accumulated valuable on-site operational experience.

Phase 4: Continuous Iteration and Market Expansion (2023.01 - Present)

This phase is dedicated to continuous product optimization and expanding market applications.

  • Released the V2.5 product with enhanced performance and stability.
  • Expanded applications in multiple domestic and international ports.
  • Continuously leading the technological innovation in automated twist-lock handling.